ISO 19650 Structured VDC Execution Process.
Our standardized 6-stage lifecycle guarantees zero site rework, compressed construction timelines, and seamless digital twin asset handover.
End-to-End VDC Execution Process
01. Laser Scan & Point Cloud Capture
High-density 3D LiDAR point cloud capture with sub-millimeter geospatial accuracy.
- Terrestrial & aerial drone LiDAR scanner data registration
- Georeferenced E57 point cloud processing & noise filtering
- Existing structure & MEP heritage scan auditing
E57 / RCP Georeferenced Point Cloud Pack
How We Deliver Zero-Clash VDC Projects
Discovery & BEP Authoring
Establishing Common Data Environment (CDE) protocols, naming containers, LOD targets, parameters, and BIM Execution Plan (BEP) aligned with ISO 19650-1/2.
ISO 19650 BEP & CDE Naming Protocol Matrix
Parametric LOD 300 Modeling
Authoring high-precision architectural, structural, and MEP baseline models from 2D CAD drawings or laser scan point cloud data.
Multidisciplinary Native Revit (.RVT) & IFC 4.3 Models
MEPF High-Density Coordination
Running automated Navisworks Manage hard and soft clearance clash matrices across mechanical HVAC, electrical, plumbing, and structural frames.
Zero-Clash Navisworks Master (.NWD) & BCF Issue Reports
Shop Drawings & Spool Generation
Extracting 2D fabrication shop drawings, sleeve location plans, beam penetration cutouts, and precast concrete rebar bending schedules (BBS).
2D Approved Shop Drawings & Spool Cut Sheet Packs
4D Scheduling & 5D QTO Cost Linking
Linking Primavera P6 / MS Project timelines to 3D elements for Synchro 4D construction sequencing and automated 5D Quantity Takeoff (QTO).
4D Synchro Sequence Animation MP4 & 5D Cost Schedule
LOD 500 COBie As-Built Handover
Integrating site-verified redline updates and COBie 2.4 equipment asset metadata for facility management in Autodesk Tandem.
COBie 2.4 Excel Sheet & LOD 500 Facility Digital Twin
Why Leading AEC Teams Partner With BIMVEDH
We bridge the gap between design vision and site execution with rigorous ISO-compliant workflows, engineering precision, and transparent digital collaboration.
Engineering-First Methodology
Led by structural architects and licensed civil engineers—not just software drafters. Every model parameter is validated for physical constructability.
OpenBIM & IFC Interoperability
Full buildingSMART IFC 4.3 & BCF support ensuring zero data lock-in across Revit, Navisworks, Solibri, and Tekla software platforms.
ISO 19650 Quality Framework
Standardized Common Data Environment (CDE) naming conventions, information container exchange protocols, and QA/QC check matrices.
Multidisciplinary QA Audit
Rigorous 3-stage internal clash detection process prior to client submission: Hard Clashes, Clearance Tolerances, and Maintenance Access.
24/7 Responsive Technical Support
Dedicated project lead assigned to every account with guaranteed 24-hour turnaround for RFI clarifications and model updates.
Modern VDC Automation Engine
Proprietary Dynamo automation scripts, Revit API routines, and 4D/5D computational integration for rapid model production.